- How to install Acoustalay Adhesive+
Installation temperature: 5 ° C to 50 ° C 1. Ensure the floor is clean and flat. A flat sub-floor means deviations of less than 2mm over 2.5m. 2. Unroll at 90 ° to the direction of the floor. 3...
- How to install Acoustalay 200
Ensure floor is clean and flat (a flat sub-floor means deviations of less than 2mm over 2.5m). Unroll at 90º to direction of the floor, covering area to be laid.To assist laying, apply double side...
- How to install Acoustalay 250
Ensure floor is clean and flat (a flat sub-floor means deviations of less than 2mm over 2.5m). Unroll at 90º to direction of the
floor, covering area to be laid.To assist laying, apply double si...
- How to install Acoustalay 250 Foil
Ensure floor is clean and flat (a flat sub-floor means deviations of
less than 2mm over 2.5m). Unroll at 90º to direction of the
floor, covering area to be laid - with metal surface upwards. ...
- How to install Acoustalay 250 DPM
Ensure floor is clean and flat (a flat sub-floor means deviations of less than 2mm over 2.5m). Unroll at 90º to direction of the floor, covering area to be laid.To assist laying, apply double side...